Alum Creek P1 - Trail Maintenance

  • Alum Creek P1

Here's the agenda to get P1 in shape for this Fall/Winter. COMBO will have tools on hand but feel free to bring pruning sheers, shovels, 5 gallon buckets and leaf rakes.

* Reinstall the bridge located around 2 mile marker
* Remove leaning tree at ravine before the creek crossing
* Cut back corridor where needed
* Run string trimmer on beginner loop
* Remove log over or improve it. (Location unknown)
* Fix major holes that swallow 26" wheels. :)